This is what we started with. We had to put down a pathway of sheets through the bedroom for the workers to walk on. |
There was a lot to rip out - right down to the outside block wall. |
A new, proper subwall was put in...the original builders had slapped the tile right onto drywall. It was good to see the tile go on. |
Toilet in the shower? That's where it had to sit while the floor was being re-done. |
The main floor was re-done. |
Now I can take a shower in peace, knowing that the black mold monster will not get ahold of me! And I’ll be able to see what I’m doing.
P.S. Dan put the shower light in himself!! YAY Dan!!
No comments:
Post a Comment