| This is what we started with.  We had to put down a pathway of sheets through the bedroom for the workers to walk on. | 
|  | 
| There was a lot to rip out - right down to the outside block wall. | 
|  | 
| A new, proper subwall was put in...the original builders had slapped the tile right onto drywall. It was good to see the tile go on. | 
|  | 
| Toilet in the shower?  That's where it had to sit while the floor was being re-done. | 
|  | 
| The main floor was re-done. | 

P.S. Dan put the shower light in himself!! YAY Dan!!
 
 