| This is what we started with. We had to put down a pathway of sheets through the bedroom for the workers to walk on. |
![]() |
| There was a lot to rip out - right down to the outside block wall. |
![]() |
| A new, proper subwall was put in...the original builders had slapped the tile right onto drywall. It was good to see the tile go on. |
![]() |
| Toilet in the shower? That's where it had to sit while the floor was being re-done. |
![]() |
| The main floor was re-done. |

P.S. Dan put the shower light in himself!! YAY Dan!!